Knight in armour holding the CodeShop QC shield and sword over equipment drawings

Nothing ships unsigned.

CodeShop QC puts every hold point in your inspection and test plan in front of the people who sign it, and files every signed record to the item's turnover package.

CodesB31.3 · VIII-1 · D1.1
Sign-offSigned on the tablet
RecordsLocked once issued
02 · Creator

Build the workflow. Build the forms.

Any admin in your org can change stages, sign-offs, forms and what each role sees. Changes go out as a numbered revision once a second admin approves them.

01

Workflow

Stages in order or in parallel. Set each one as a hold, witness or record review, choose who signs, and decide where rejected work goes back to.

02

Forms

Build the form for each stage from QC field types: register lookups, heat numbers, accept or reject checks, photos and signatures.

03

Layouts

Give QC managers, inspectors, welders and clients their own navigation and home page.

04

Revisions

Every edit is logged. A second admin approves before a revision reaches your jobs, and one job can override the org standard.

The Creator: an eight-stage ASME B31.3 spool workflow with the Visual (VT) hold point open for editing
The Creator. Each stage is a hold, witness or record review, with its own signers and form.
03 · On the floor

Sign off at the weld, not back at the desk.

01

Open the item on a tablet at the work. Every record is on the sheet your crew already knows, with a blank for every field.

02

The item, serial and customer fill in on every sheet. Weld and heat numbers are checked against the weld map and the material register.

03

Your inspector, the Authorized Inspector or the customer's inspector prints their name and signs on the screen, and the time is stamped. The signer needs no login.

04

A rejected result is recorded where it was found, and an NCR is raised against the item on the spot.

CodeShop QC on an iPad: spool SP-07 with its eight-stage rail, the Examine stage open, and the plan's Visual, RT and UT hold points listed above the stage's records
An item on an iPad: the stage rail, the plan's hold points, and the records for the stage you open.
04 · Turnover package

The data book fills in as you sign.

Each signed stage files its record to the item's turnover package. When the last hold point is released, the index is complete and ready for the client.

Turnover package · Spool SP-07Job 24-118Index
No.RecordFiled from
01Weld map02 Fit-up
02Weld log03 Welding
03Welder qualifications and continuity03 Welding
04WPS and PQRWPS library
05Material test reports and heat trace01 Material receipt
06Visual inspection reports04 Visual (VT)
07NDE reports: RT and UT05 RT and UT
08PWHT charts06 PWHT
09Hydrotest report and gauge certificates07 Hydrotest
10NCRs and dispositionsAny rejected stage
11Release and data report08 Final release

Earlier workflow revisions are kept unchanged, so you can always see what the plan required on a given date.

Built around the item, not the job.

A purchase order closes. The vessel does not. Fifteen years from now an inspector will look up its National Board number without ever having heard your job number. So every record hangs off the item itself: heat numbers, welds, procedures, examinations and tests, traceable from the mill certificate to the nameplate.

When the nameplate goes on and the data report is signed, the package locks. Nobody quietly edits the weld log on a vessel that has already shipped.

Level 1

Your shop's authorization

What a joint review examines, and it belongs to the shop: the quality control manual, the inspection agreement, procedures and welder continuity, the calibration register, and certificates of authorization with their three-year expiry tracked.

Level 2

The item's package

What travels with the vessel: full traceability through to the data report, the nameplate and National Board registration, hold points signed by the Authorized Inspector, and NCRs and RFIs against the item.

05 · Codes

Start from a workflow written for your code.

B31.3Process piping spools8-step starter workflow
VIII-1Pressure vessels8-step starter workflow
SkidSkids and packages8-step starter workflow
D1.1Structural steel7-step starter workflow

Working to another code or a client spec? Start blank, or copy one of these and edit it.

06 · Security and audit trail

What is in place, and what is not yet.

Owner/operator security reviews get a straight answer. Our controlled security documents describe the controls we actually run, and every gap has a dated action in the risk register.

In place

Each organization’s records are kept separate by row-level security in the database.
Every change to a record is written to an audit trail.
Issued reports are locked. A signed record cannot be edited.
HTTPS enforced with strict transport security and a content security policy.
Written incident response, patching, and backup and recovery plans.

Not yet in place

Multi-factor authentication
Single sign-on and SCIM provisioning
Self-serve data export
Public status page

Each is a dated action in CSQ-SEC-004, the information security risk register.

Security document set · Rev A
CSQ-SEC-000Document control procedure
CSQ-SEC-001Incident response plan
CSQ-SEC-002Patch and vulnerability management
CSQ-SEC-003Secure development lifecycle
CSQ-SEC-004Information security risk register
CSQ-SEC-005Privacy impact assessment
CSQ-SEC-006Data residency and subprocessors
CSQ-SEC-007Business continuity and recovery
CSQ-SEC-008Security baselines
Request the security pack
07 · Pricing

Priced by shop, not by record.

Shop

One fab shop
Contact us today for pricing
All four code templates
Creator: workflows, forms and layouts
On-screen signatures on the shop-floor tablet
Turnover package per item
Free read-only seats for your customer's inspectors
Book a demo

Enterprise

Several shops, yards or clients
Contact us today for pricing
Everything in Shop
One org standard, with overrides per job
Shared WPS and welder records across shops
Free seats for owner/operator inspectors and the Authorized Inspector, who signs hold points
Security pack and review support
Onboarding help with your ITPs and forms
Contact sales
Add-on

Joint review preparation, for an R or U stamp

Most shops fail the first stage on paperwork they already had, filed where nobody could find it under questioning. CodeShop QC keeps the evidence in the shape the review asks for. One engagement covers the cycle, including the thirty-day follow-up and any re-review, through to closure.

Contact us today for pricing
1Preparation

QC manual against current code guidance, a valid inspection agreement, codebooks and inspector logs to hand.

2Review audit

Document audit, facility walkthrough of tools and calibration, and interviews on how procedures are actually followed.

3Issuance

Deficiencies tracked to closure, the review team's report completed, and the certificate issued for three years.

08 · FAQ

Questions we get in the first call.

Yes. The Creator lets any admin in your org set the stages, the hold and witness points, who signs each one, and the form filled at each stage. Start from a code template or from blank.

There are starter workflows for ASME B31.3 piping, ASME VIII Div 1 vessels, skid and package work, and AWS D1.1 structural. Other codes and client specs are built by copying one of these or starting blank.

Workflow changes go out as a new revision after a second admin approves them. Earlier revisions are kept unchanged, so you can see what the plan required on any date, and issued reports are locked against edits.

Yes. Your customer's inspectors and the Authorized Inspector get free seats. They can see the package, the Authorized Inspector signs hold points, and the one other thing they can write is their own observations. Anyone can also sign a record on your tablet without an account. In the Creator you can name Client and Authorized inspector as signers on any hold or witness point.

Not yet. CodeShop QC is built for new construction, so a vessel you stamp today has no repair history in the app until that workflow ships. Joint review preparation for an R stamp is unaffected: that covers your shop's authorization to perform repairs, which is a separate thing.

Not yet. Both are open actions with target dates in our risk register (CSQ-SEC-004), which we share as part of the security pack.

Your first plan is built on the demo call: we start from the starter closest to your code and change it with you. After that, setup is entering what your shop already keeps (your people, welders and procedures, and your calibration register) once, so every item can cite them. The blank forms work from day one with no setup at all.

09 · Book a demo

Bring one of your ITPs.

In 30 minutes we build it in the Creator with you, run a spool through it, and show you the turnover package at the end.

Name, work email and company are required.
CodeShopQC

Sign in

Document control for your code shop.

No account yet?
CodeShopQC

Choose a new password

You followed a reset link. Set a password and you’ll be signed in.

CodeShopQC

Name your shop

This is the organization every item, job and certificate will belong to. You can rename it later.

Ready to stamp?
Data book preview
CodeShopQC
Loading...
CodeShopQC
Checking your invitation...
CodeShopQC

Items

Iso Sketch

Loading the editor...

Drawing

Ink
— / —
No PDF is attached to this drawing yet.
Use Attach PDF above to put the issued drawing here and mark it up.

Pages

Tags on this page

Notes on this page

Markups save to the drawing record as you make them, per page. A weld or heat tag is checked against the weld map and the material register, the same way the weld map is — a tag nothing on file matches is flagged, not refused. Drag a tag box to move it; the × in its corner removes it.